Kitchen Remodeling

Kitchen remodeling with a fixed price and a schedule that holds.

A typical Hill Country kitchen rebuild lands around $32,000 and takes 10 to 21 working days. What decides whether it lands there is how honestly the scope was written before demolition — cabinet lead time, electrical capacity, and hard water are what actually move a kitchen budget.

Custom Hill Country kitchen with inset white cabinetry, white oak island and stone countertops
~$32k Typical standard rebuild 200 sq ft, mid-grade
10–21 Working days Standard rebuild
$44.8k Premium starts at Custom cabinetry and stone
Named Allowance amounts Itemized in the contract

What actually drives the price of a kitchen remodel here?

Cabinetry is normally 40 to 50 percent of a kitchen budget, which is why the cabinet decision — stock, semi-custom, or custom — moves the number more than any other single choice. After that it is countertop material, whether the layout changes (a moved sink or range means plumbing and electrical work inside finished walls), and whether the electrical panel can carry a modern kitchen’s circuit load. In 1980s and 1990s Hill Country homes a 100-amp panel frequently cannot, and that is a $2,400 to $4,600 line item people do not see coming.

Published pricing

Three kitchen tiers.

Ranges for a typical room at mid-grade materials. The calculator scales them to your actual square footage and conditions.

Refresh
$18.5k – $26k
Typical 180 sq ft · 8–14 working days

Keep the existing layout. New counters, backsplash, sink, faucet, lighting, paint, and either new doors and drawer fronts or professionally refinished boxes.

  • Countertops and full backsplash
  • Cabinet refacing or refinishing, new hardware
  • Sink, faucet, disposal
  • Recessed and task lighting, GFCI updates
  • Paint and finish carpentry
Not included: Moving walls, plumbing, or appliance locations; New cabinet boxes; Flooring.
Most requested
Standard Rebuild
$29k – $35.5k
Typical 200 sq ft · 10–21 working days

New semi-custom cabinetry, quartz counters, tile, flooring, and lighting in essentially the existing footprint. This is the most common kitchen we build.

  • New semi-custom cabinetry, soft-close throughout
  • Quartz countertops and tile backsplash
  • New flooring across the kitchen
  • Sink, faucet, disposal; appliance install
  • Electrical brought to current code in the work area
  • Recessed, under-cabinet, and decorative lighting
  • Ducted range hood to the exterior
Not included: Structural changes or removing load-bearing walls; Appliances themselves; Relocating the gas or main plumbing stack.
Premium / Full Custom
$44.8k – $68k
Typical 260 sq ft · 21–45 working days

Custom or inset cabinetry, stone or premium quartz, layout changes, and a designed lighting plan. Structural work and island relocation are in play.

  • Custom or inset cabinetry to the ceiling
  • Natural stone or premium quartz, full slab backsplash available
  • Layout changes, island relocation, structural review where needed
  • Designed lighting plan and full electrical rework
  • Panel-ready and professional appliance integration
  • Plaster or custom hood, specialty finish carpentry
Not included: Appliances themselves; Whole-home work outside the kitchen envelope.
Scale these to my room See monthly payments

Cabinet lead time is the schedule

Nearly every blown kitchen schedule traces back to the same thing: demolition started before the cabinets were confirmed. A crew tears out a functioning kitchen in two days and then everyone waits six weeks for a delivery, with the family eating off a folding table.

We lock selections and get written confirmation of the cabinet ship date before demolition is scheduled. If the cabinets you want are eight weeks out, the correct answer is to keep cooking in your kitchen for seven of those weeks — not to demolish it and call the delay unforeseeable.

Hard water changes what belongs in a kitchen

Hill Country groundwater moves through limestone and typically tests 15 to 25 grains per gallon. In a kitchen that shows up in three places: the faucet cartridge, the dishwasher, and any tankless water heater in the scope.

We plan the softener loop location at rough-in rather than as a retrofit, specify faucet bodies and cartridges that tolerate scale, and install isolation and service valves on tankless units so descaling is a routine service call instead of a disassembly. Untreated hard water voids most tankless manufacturer warranties, which is worth knowing before you buy one.

Ventilation and electrical get done to code, not to “good enough”

A range hood recirculating through a charcoal filter is not ventilation. We duct hoods to the exterior with a proper cap and a make-up air path where the CFM requires it.

On the electrical side, we bring circuits in the work area to current code: dedicated appliance circuits, GFCI and AFCI protection where required, and enough small-appliance branch circuits that your counters actually work. If the panel needs upgrading we say so in the bid, at a price, rather than discovering it on day four.

The specification

What is in scope, in writing.

This is the level of detail our bids carry. If another bid does not name these things, you are comparing two different projects.

Cabinetry
Stock, semi-custom, or custom — ship date confirmed in writing before demolition
Countertops
Quartz, quartzite, or natural stone; templated after cabinet install, never before
Electrical
Circuits in the work area brought to current code; panel capacity verified at the walkthrough
Ventilation
Range hood ducted to the exterior with a proper cap; make-up air where CFM requires
Water
Softener loop located at rough-in; scale-tolerant faucet cartridges specified
Flooring
Installed after cabinets where the assembly requires it, so toe kicks and transitions are right
Allowances
Tile, counters, fixtures, and hardware named in dollars in the contract
Warranty
10-year workmanship through our home service partners, plus manufacturer warranties
The difference

Where corners normally get cut.

What you often get
What we do
Demolition starts before cabinets are confirmed
Written cabinet ship date before demolition is scheduled
“Allowance” with no dollar figure attached
Allowance amounts named in dollars in the contract
Range hood recirculating into the room
Ducted to the exterior with a proper cap
Panel capacity discovered mid-project
Panel load checked at the 30-minute walkthrough
Countertops templated off drawings
Templated off installed cabinets
A range that grows into a final invoice
One fixed written price for the scope
Kitchen Remodeling FAQ

Straight answers.

Is $32,000 realistic for a kitchen in Comal County?
For a standard rebuild of a typical 200 sq ft kitchen in roughly the existing footprint, with semi-custom cabinetry and quartz counters, yes — our band is $29,000 to $35,500 at mid-grade materials. It stops being realistic when the layout changes, when cabinetry goes custom or inset, or when a wall comes out. Those are real costs, not upsells, and they belong in the bid rather than in a change order.
Can you keep my existing layout to save money?
Usually yes, and it is the single biggest saving available. Keeping the sink, range, and refrigerator where they are avoids opening finished walls for plumbing and electrical. A refresh that keeps the layout and replaces doors, counters, backsplash, and lighting starts around $18,500 and often reads as a bigger change than the cost suggests.
Do I need a designer?
Not necessarily. If you have one we build to their drawings and handle the county side. If you do not, we scope and select with you — against your electrical capacity, your water hardness, and your budget — which covers most kitchens that are not changing footprint.
What about appliances?
We install them and coordinate the rough-ins, but the appliances themselves are not in our price. That is deliberate: appliance pricing swings with sales cycles and you should not pay a contractor margin on a refrigerator. We will tell you the rough-in dimensions and the electrical and gas requirements before you buy.
Will I have a working kitchen during the build?
Not the real one. We set up a temporary kitchen with your refrigerator, a microwave, and a working sink where the plumbing allows, and we tell you in the written schedule exactly which days the water and power in that area go down.
How do you handle dust?
Zip walls at the work-area boundary, floor protection on the path in and out, negative air where the demolition warrants it, and daily cleanup. It is a construction site, but it should not put drywall dust in your bedroom.
Free estimate

Your kitchen price, fixed, in 24 hours.

A 30-minute walkthrough with the project owner, then a written fixed price within a day. No commission salespeople and no obligation.

Contractor reviewing a remodel scope with homeowners in their kitchen

Request a kitchen bid

We call to set a 30-minute walkthrough. Your written fixed price follows within 24 hours of that visit. No commission salespeople, no financing pitch at the door.

Fixed price in 24 hours

Find out what your kitchen actually costs.

Book the 30-minute walkthrough. Written fixed price within 24 hours.

Call Get My Fixed Price